Language
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer
Pouring Mixer

定制化服务,满足您的独特需求!河南正一机械,根据您的生产规模和要求,量身打造专属的AAC加气混凝土砌块生产线设备!

在线留言
产品详情

    The casting mixer is the main equipment for aerated concrete production. It is mainly used to mix the slurry, cement, quicklime, gypsum and aluminum powder paste suspension injected into the tank according to a certain proportion, so as to make it evenly mixed and fully reacted, and inject the mixed slurry into the mold frame in time.

    Pouring mixer use:

    It is used for mixing the production raw materials to make them evenly mixed and fully reacted, and injecting the mixed slurry into the mold frame in time.

    The structural characteristics of the casting mixer:

    Pouring mixer aerated concrete pouring mixer adopts spiral slurry mixing, forming a strong vortex in the tank, destroying the envelope of quicklime particles, so as to achieve a full and uniform mixture. Meanwhile, the liftable pouring arm adjusts the height with the pouring process to prevent splashing. This machine is divided into fixed and mobile type with slurry, quantitatively poured on the mold.

    Pouring mixer is divided into fixed and mobile with slurry, quantitative pouring on the mold.

    Pouring mixer operating procedures:

    1. Check whether the pouring mixer equipment, electrical instrumentation, air circuit, valves, etc. is normal, and whether the common tools such as pry bar, hammer, etc. are ready. Release the water in the compressed air bag.

    2. When the core, the hand is not allowed to close the mold before leaving, in order to prevent extrusion. When two people operate, they must concentrate, cooperate with each other and take care of each other. Poured castings should be stacked neatly and smoothly. Stacking height should be moderate, and pay attention to leave a walkway.

    3. In case of core head, core plate damage or poor mold, not pouring. When the mold pouring, die-casting machine in front of the people shall not stand, so as to avoid running fire burns. Serious fire and other emergencies, should be immediately deflated, cut off the power supply. To run fire out of the metal liquid, should be dealt with in a timely manner.

    4. Lifting work should comply with the hook worker safety regulations. Wire rope should be checked for damage before use, the hook should be hung firmly and steadily before lifting.

    5. Funnel, rapid thermometer, thermocouple paint should be dried before use.

    6. After the completion of the valve should be closed, cut off the power supply of the equipment, clean up the work site.

推荐产品